Your Position: Home > Products > Gate Valve
Page 2 of  4

JS-B1102
Technical Requirement
  1. Before assembling, all parts should be clean, no oil or grease, remove all burrs and sharp edges.
  2. Before connecting, body cap male thread should be coated with sealing glue.
  3. Handle turn or close freely.
  4. After assembling, test by water at pressure no less than 0.8MPA, no leakage.
No.
Name
Material
1
Body
BRASS
2
Wedge
BRASS
3
Bonnet
BRASS
4
Washer
Red paper gasket
5
Stem
BRASS
6
Screwed ring
BRASS
7
Packing
PTFE
8
Brass gasket
BRASS
9
Press nut
BRASS
10
Handwheel
Al
11 Washer Al
12 Nut STEEL
DN
A
B
C
L
H
D
1/2"
13
13
 
45.5
82
55.5
3/4"
19
13
 
48
97
60
1"
24
14
 
52
108
65
1-1/4"
31
16.5
 
60
121
74.5
1-1/2"
35
16.5
 
62
138
80
2"
46
18.5
 
70
147
90
3"
65
21
 
81
208
120
4"
90
26
 
98
260
141


 
1 3 4
กก


Add: Qinggang Industrial Zone,
Yuhuan, Zhejiang, China
Tel: 86-576-87121798
       86-576-87121508
Fax: 86-576-87121505
E-mail: sales@jushui.com
WEBSITE: www.jushui.com
SHANGHAI BRANCH
Add: Room 22H, Huadu Building, No.838 Zhangyang Road, Shanghai, China
Tel : +86-21-50817273